Reviewed and updated: August 2026
Calculate cubic yards and bag count for round post holes, square footings, and concrete piers. Enter dimensions and number of footings to get your total concrete order.
Use this concrete footing calculator to estimate the volume of concrete needed for round post holes, square pad footings, or cylindrical piers. Results include cubic yards, cubic feet, and bag count for both 60 lb and 80 lb bags. A 10% waste factor is included automatically.
This calculator handles three common footing types. Round post holes are used for deck posts, fence posts, and mailboxes. Square footings are used under columns, shed corners, and pad foundations. Cylindrical piers are used for raised foundations and support structures. Select the tab that matches your project, enter your dimensions and number of footings, and get your concrete order instantly.
Footing depth depends on your local frost line, the depth at which the ground freezes in winter. Footings must extend below the frost line to prevent heaving. Check with your local building department for the required depth in your area.
| Climate Zone | Typical Frost Line | Recommended Footing Depth |
|---|---|---|
| Southern US (Zone 9–10) | 0–12 inches | 12–18 inches minimum |
| Mid-Atlantic / Pacific NW | 12–24 inches | 24–30 inches |
| Midwest / Northeast | 24–48 inches | 42–54 inches |
| Northern US / Canada | 48–72 inches | 60+ inches |
For small footing projects, bagged concrete is the most practical option. For larger pours, ready-mix delivery is significantly more cost-effective, but most suppliers have a minimum order of 1 cubic yard with a short-load fee for smaller quantities.
For piers and deep post footings, you generally have two forming options, and the choice affects both the finished quality and how much concrete you actually need.
Direct pour means pouring concrete straight into the earth-walled hole with no form. It's the fastest and cheapest method, and it's standard practice for most fence posts and mailbox posts. The tradeoff is that the hole's actual shape depends on how cleanly it was dug; a hand-dug or auger hole in loose or rocky soil often ends up wider or more irregular than its nominal diameter, which means your actual concrete usage can run noticeably higher than the calculator's estimate for a perfectly cylindrical hole. This is one of the best arguments for keeping the waste factor rather than trying to trim it.
Sonotube (cardboard form) pour means dropping a rigid cardboard tube into the hole and pouring inside it. This gives you a smooth, precisely sized cylindrical footing regardless of how rough the excavation is, and it's the standard approach for anything structural, like deck posts and piers that need an exposed, finished concrete column above grade. Sonotubes cost a few dollars each but make the calculator's volume estimate far more accurate, since the poured shape will actually match the diameter you entered rather than whatever shape the hand-dug hole happened to take.
A bell-bottom footing (also called a belled or flared footing) widens at the base, like an upside-down cone or bell shape, rather than staying a uniform cylinder from top to bottom. The wider base does two things: it spreads the structure's load over more soil area, reducing bearing pressure, and it resists frost heave better than a straight-sided hole, since the flared base is harder for freezing, expanding soil to push upward against.
Bell-bottom footings are usually created with a specialized auger attachment that flares out at the bottom of the bore, and they're most common on engineered deck footings in regions with significant frost heave risk. If your local code requires a belled base, account for the extra concrete: a typical bell adds roughly 20 to 40% more volume at the base compared to a straight cylinder of the same top diameter, so budget accordingly beyond what this calculator's straight-cylinder math shows for the round hole tab.
Concrete gains strength over time, not instantly, and different tasks require different amounts of cured strength before they're safe to proceed with.
👉 60 lb vs 80 lb bags: A 60 lb bag yields approximately 0.45 cubic feet. An 80 lb bag yields approximately 0.60 cubic feet. Mixing 80 lb bags by hand is harder work but requires fewer bags. For post holes, most DIYers use the fast-setting variety: just pour dry mix into the hole and add water.
For simple post holes (fence posts, mailbox posts, and other non-structural applications), rebar is usually unnecessary; the post itself and the surrounding soil provide adequate lateral support, and the concrete's main job is just holding the post in place and resisting frost heave. For structural footings, deck posts, and piers carrying real building loads, most codes and engineers call for vertical rebar (typically one or more #4 bars running the depth of the footing) to tie the footing to the post base hardware and resist uplift and lateral forces. Square pad footings under posts or columns often use a grid of horizontal rebar near the bottom of the pour to resist cracking and spread the load. When in doubt, check your local code or ask your building department; the cost of rebar is minor compared to the cost of a footing failure. If you are adding rebar, position it so it stays centered in the pour with at least 2 to 3 inches of concrete cover on all sides; rebar sitting against the soil wall of the hole or too close to the surface can eventually corrode and cause the surrounding concrete to spall.
| Project | Typical Hole Size | Notes |
|---|---|---|
| Fence post (4×4) | 10" diameter × 30–42" deep | Depth below frost line |
| Deck post (4×4 or 6×6) | 12" diameter × 42–48" deep | Code requires permit in most areas |
| Mailbox post | 8" diameter × 24" deep | No permit typically required |
| Shed corner pad | 18"×18"×8" square | Non-structural, surface footings common |
| Pergola post | 12–16" diameter × 36–48" deep | Deeper for taller structures |
Concrete Calculator: for slabs, pads, and larger pours.
Fence Calculator: estimate posts, rails, and pickets for your fence project.