Reviewed and updated: August 2026
Calculate framing lumber, sheathing, roofing, siding, floor decking, and total cost for any shed size. Covers gable, lean-to, and gambrel shed styles with a full line-item material list.
Enter your shed dimensions, roof style, and material choices to get a detailed estimate with a low-to-high cost range. Always check local permit requirements before building.
Choosing the right shed size is the most important decision of the project. The most common mistake is building too small, sheds fill up faster than expected, and adding on later costs far more than sizing up from the start.
| Size | Square Feet | Best For | Typical Material Cost |
|---|---|---|---|
| 8 x 10 | 80 sq ft | Lawn mower, basic tools, bikes, garden supplies | $1,500 to $2,500 |
| 10 x 12 | 120 sq ft | Most popular size, riding mower, workbench, general storage | $2,000 to $4,000 |
| 12 x 16 | 192 sq ft | Serious storage, small workshop, ATV or golf cart | $3,500 to $6,000 |
| 12 x 20 | 240 sq ft | Full workshop setup, tractor storage, large equipment | $4,500 to $8,000 |
| 16 x 20 | 320 sq ft | Large workshop, multiple vehicles, loft storage option | $6,000 to $12,000 |
| 16 x 24 | 384 sq ft | Detached garage alternative, full shop, studio space | $8,000 to $16,000 |
Material costs above cover framing lumber, sheathing, roofing, siding, and a basic door. Windows, electrical, insulation, and a concrete slab foundation are not included and add significant cost. Professional labor typically adds 50 to 100 percent on top of material cost.
Foundation choice affects cost, permanence, drainage, and permit requirements. Most jurisdictions treat sheds on permanent foundations differently from sheds on non-permanent foundations for permit and setback purposes.
| Foundation Type | Cost Range | Best For | Permanence |
|---|---|---|---|
| Gravel pad with PT skids | $100 to $400 | Most sheds under 200 sq ft, most popular DIY choice | Non-permanent, removable |
| Concrete deck blocks | $100 to $300 | Level sites with good drainage, sheds up to 200 sq ft | Non-permanent, adjustable |
| Concrete tube piers | $300 to $800 | Sloped sites, soft soil, frost heave areas | Semi-permanent |
| Concrete slab | $800 to $3,000+ | Workshops, heavy equipment, large sheds over 200 sq ft | Permanent |
| Helical piers | $1,500 to $4,000 | Very soft or unstable soil, flood-prone areas | Permanent, professional install |
For most backyard storage sheds, pressure-treated 4x4 or 4x6 skids on a 4 to 6 inch compacted gravel pad is the right choice, inexpensive, well-draining, non-permanent for permit purposes, and adjustable if settling occurs. The gravel pad should extend at least 6 inches beyond the shed footprint on all sides for drainage. For concrete slab quantities, use our concrete calculator.
Shed framing follows the same principles as house framing at a smaller scale. Understanding the components helps you verify the material list and plan your build sequence.
The floor frame sits on the skids or foundation. It consists of rim joists and floor joists running across the short dimension at 16-inch on-center spacing. For most sheds, 2x6 floor framing is standard, strong enough for typical loads and wide enough for 3/4-inch tongue-and-groove plywood decking. Pressure-treated lumber is required for all framing in contact with or within 6 inches of grade.
Shed walls are typically framed with 2x4 studs at 16-inch on-center spacing with a single bottom plate and double top plate. Corner assemblies use three studs to provide nailing surface for interior and exterior sheathing. Rough openings for doors and windows require headers, typically doubled 2x6 for spans up to 4 feet on a non-load-bearing shed wall.
| Siding Type | Cost per Sq Ft | Lifespan | Maintenance | Notes |
|---|---|---|---|---|
| T1-11 plywood siding | $1.50 to $2.50 | 15 to 25 years | Paint every 5 to 7 years | Most popular for sheds, structural and finish in one panel |
| LP SmartSide (engineered wood) | $2.00 to $3.00 | 25 to 30 years | Paint every 8 to 10 years | Better moisture resistance than T1-11; pre-primed |
| Vinyl lap siding | $1.50 to $3.00 | 20 to 40 years | Wash periodically | No painting required; can crack in very cold weather |
| Wood lap siding | $2.50 to $4.00 | 20 to 40 years | Paint or stain every 3 to 5 years | Classic appearance; highest maintenance of wood options |
| Metal (steel or aluminum) | $2.00 to $4.00 | 30 to 50 years | Minimal | Most durable; can dent; good for high-wind areas |
For roofing material quantities, use our roofing calculator.
For detailed lumber quantities, use our lumber calculator. For roofing material estimates, use our roofing calculator. For concrete slab quantities, use our concrete calculator. For total project budgeting, see our project cost estimation guide.
A standard gable shed has five main framing assemblies: the floor frame (skids, joists, decking), wall frames (plates, studs, headers), roof frame (rafters, ridge board, sheathing), and the door and window rough openings. The diagram shows a typical 12×16 gable shed layout.
Standard stud spacing: 16" OC · Roof pitch determines rafter length · Door R.O. typically 2" wider and taller than door size
Permit requirements for sheds vary significantly by municipality. The most common threshold is 120–200 square feet, sheds under this size may be exempt from permit requirements in many jurisdictions, while larger sheds require a building permit and may have setback requirements from property lines and structures.
| Situation | Typical Requirement | Notes |
|---|---|---|
| Under 120 sq ft | Often permit-exempt | Varies widely by municipality, always verify locally before building |
| 120–200 sq ft | Permit required in most jurisdictions | May still be exempt in rural areas or unincorporated counties |
| Over 200 sq ft | Permit required almost universally | May also trigger electrical permit if wired |
| Permanent foundation | Permit required at any size | Concrete slab or piers = permanent = permit in most codes |
| HOA community | HOA approval required regardless of size | Style, color, and placement restrictions common |
| Flood zone (AE or VE) | FEMA elevation requirements apply | Floor must be above Base Flood Elevation |
Siding choice affects appearance, durability, and maintenance requirements significantly. For a utilitarian storage shed, T1-11 plywood is the practical default. For a workshop or structure that needs to match the house, LP SmartSide or vinyl may justify the additional cost.
| Siding Type | Material Cost (per sq ft) | Lifespan | Maintenance | Best For |
|---|---|---|---|---|
| T1-11 plywood | $0.80–$1.50 | 15–25 years with paint | Paint every 5–7 years | Most sheds, easy to install, widely available |
| LP SmartSide (engineered) | $1.50–$3.00 | 25–30 years | Paint every 7–10 years | Workshop, studio, structures near house |
| Vinyl siding | $1.00–$2.50 | 30–40 years | Very low, wash annually | Matching house siding; minimal maintenance |
| Wood lap siding | $2.00–$5.00 | 20–30 years | Paint every 5–7 years | Traditional appearance; matches older homes |
| Metal / corrugated | $0.50–$1.50 | 30–50 years | Very low | Agricultural, utilitarian, maximum durability |
| Cedar shingles | $3.00–$6.00 | 20–30 years | Stain every 4–6 years | Premium appearance; natural aesthetic |
Adding electricity to a shed significantly increases its usefulness but also adds cost and permit requirements. Here is what to know before running power to a detached structure:
Permits: A separate electrical permit is required in virtually every jurisdiction for new electrical service to a detached structure. The work must be inspected before closing the walls.
Service options: Power can be run from the main panel via underground conduit (most common), overhead cable (where allowed by local code), or from a sub-panel in the house. Underground runs require burial depth of 24 inches for rigid conduit or 6 inches for Schedule 80 PVC in most jurisdictions, verify with your local electrical code.
Sub-panel sizing: A 60-amp sub-panel handles most workshop needs (lights, receptacles, small tools). If you plan to run a 240V table saw, air compressor, or welder, size up to 100 amps. The cost difference between 60A and 100A is modest at the sub-panel; the cost of upgrading later is significant.